MRC | Criteria | Characteristic |
---|---|---|
ZZZV | III FSC APPLICATION DATA | START LIMITER VALVE SLEEVE INSTALLATION/SIZING FIXTURE |
AGAV | III END ITEM IDENTIFICATION | ENGINE,ASSEMBLY TURBOFAN; F100 |
FTLD | III FUNCTIONAL DESCRIPTION | DURING ASSEMBLY OF THE GAS GENERATOR FUEL CONTROL,THE START LIMITER VALVE SLEEVE AND SEALING PLUG MUST BE INSTALLED INTO THE PLA RATE LIMITER BODY ASSEMBLY; INSTALLATION IS MADE DEFFICULT BY ONE PREFORMED PACKING ON THE SEALING PLUG AND TWO PREFORMED PACKING ON THE START LIMITER VALVE SLEEVE; TOOLING IS REQUIRED TO SIZE AND COMPRESS THE PACKING FOR INSTALLATION AS WELL AS TO HOLD THE PARTS FOR INSTALLATION INTHE PLA RATE LIMITER BODY ASSEMBLY |
Low Price Warrantied inventory at competitive prices
Find it fast Search the world's largest inventory of electronic components by manufacturer, category or part number
Quality guaranteed We sell only warrantied and traceable parts
Get it fast All inventory ready to ship from our sellers
We Hope that You Will Visit Us Again the Next Time You Need NSN Parts and Make Us Your Strategic Purchasing Partner.
Request for Quote